Project Area | Indicator | Survey date | Statistical significancea | |
---|---|---|---|---|
November 2014 | June 2015 | |||
Area A | Wasting | 0.3% (7/2,184) | 3.1% (9/294) | p = 0.000 |
Underweight | 10.9% (239/2,194) | 20.1% (59/294) | p = 0.000 | |
Area B | Wasting | 0.8% (17/2,051) | 4.4% (13/294) | p = 0.000 |
Underweight | 15.5% (317/1,071) | 20.1% (59/294) | p = 0.001 |