Scenario | Description |
---|---|
Business as Usual | The bicycle network as it existed in 2013. |
Single Cycleway | The 2013 network, plus a single 2.4 km cycleway along George Street, connecting the Green Square urban renewal area in Sydney’s Inner South with the CBD, and passing through suburbs with a large amount of public housing and Aboriginal Housing Office housing (Waterloo and Redfern). |
Complete Network | The 2013 network, plus completion of the bicycle network proposed in the Cycle Strategy and Action Plan [31]. |